LOCATION
Echalier / Clermont-Ferrand
CUSTOMER
PAPREC GROUP
INCOMING WASTE
Dry recyclable materials
HOURLY THROUGHPUT
15 T/H
ANNUAL CAPACITY
45, 000 tonnes
DELIVERY DATE
September 2021
REVAMPING OBJECTIVES:
Modernization and Increase of Line Throughput: To modernize the existing systems and increase the throughput of the production line.
Processing Extended Flow Requirements: Addressing the treatment of flow extensions in line with the new requirements.
PROJECT FEATURES:
Initial Site from the 2000s Not Designed by Aktid: The original site dates back to the 2000s and was not conceived by Aktid.
Parallel Site Operation: The site will be operational in parallel during the revamping process.
Construction Around Existing Interwoven Processes: Construction must be carried out around the existing, highly interconnected processes.
Limited Space and Volume: The project faces constraints due to limited available space and volume.
Replacement and Addition of Numerous Equipment: This includes replacing and adding various equipment such as trommels, ballistic screens, eddy currents, etc., while preserving or reusing many conveyors and other equipment.
Replacement of All Optical Sorters: A complete overhaul of the optical sorting equipment is required.
Addition of Automatic Drainage and Replacement of Sorting Conveyor: Implementing an automatic drainage system and replacing the sorting conveyor in the cabin.
Sorting Cabin and Quality Controllers Halved: The number of sorting cabins and quality controllers will be reduced by half.