LOCATION

Morlaix (22)

CUSTOMER

GUYOT ENVIRONNEMENT

INCOMING WASTE

CIW, bulky items

HOURLY THROUGHPUT

20 T/H

ANNUAL CAPACITY

60, 000 tonnes

DELIVERY DATE

2023

REVAMPING OBJECTIVES:

  • Increase in Annual Capacity: Expansion of the annual production capacity.

  • Reintegration of Non-Aktid Equipment: Reintegrating equipment not originally from Aktid.

  • Integration of Dust Extraction: Implementation of dust extraction systems on both the existing line and the Aktid line.

  • Reduction of Landfill Contribution: Optimization of energy and material recovery to reduce the share of landfill waste.

PROJECT FEATURES:

  • Parallel Site Operation: The site will be operated in parallel with ongoing activities.

  • Minimization of Line Downtime: Efforts will be made to minimize interruptions in the operation of the production line.

  • Replacement and Addition of Equipment: Replacement and addition of equipment, with preservation or reuse of many conveyors and existing materials.