LOCATION

Echalier / Clermont-Ferrand

CUSTOMER

PAPREC GROUP

INCOMING WASTE

Dry recyclable materials

HOURLY THROUGHPUT

15 T/H

ANNUAL CAPACITY

45, 000 tonnes

DELIVERY DATE

September 2021

REVAMPING OBJECTIVES:

  • Modernization and Increase of Line Throughput: To modernize the existing systems and increase the throughput of the production line.

  • Processing Extended Flow Requirements: Addressing the treatment of flow extensions in line with the new requirements.

PROJECT FEATURES:

  • Initial Site from the 2000s Not Designed by Aktid: The original site dates back to the 2000s and was not conceived by Aktid.

  • Parallel Site Operation: The site will be operational in parallel during the revamping process.

  • Construction Around Existing Interwoven Processes: Construction must be carried out around the existing, highly interconnected processes.

  • Limited Space and Volume: The project faces constraints due to limited available space and volume.

  • Replacement and Addition of Numerous Equipment: This includes replacing and adding various equipment such as trommels, ballistic screens, eddy currents, etc., while preserving or reusing many conveyors and other equipment.

  • Replacement of All Optical Sorters: A complete overhaul of the optical sorting equipment is required.

  • Addition of Automatic Drainage and Replacement of Sorting Conveyor: Implementing an automatic drainage system and replacing the sorting conveyor in the cabin.

  • Sorting Cabin and Quality Controllers Halved: The number of sorting cabins and quality controllers will be reduced by half.