KEY FEATURES

  • 2 power supplies allowing the processing of separate flows

  • Line designed to integrate a CSR production unit

  • Line robotization – 2 double-arm robots on super-heavy flows

LOCATION

Bozouls (12)

CUSTOMER

Braley

INCOMING WASTE

Construction waste, DIB

HOURLY THROUGHPUT

20 T/H

ANNUAL CAPACITY

50 000 tons

DELIVERY
DATE

2019

LMF2 video

Similar achievements